{"@id":"https://credentialengineregistry.org/resources/ce-2ed68e68-0c9a-47cd-9496-058ec6186ec6","@type":"ceterms:Certification","@context":"https://credreg.net/ctdl/schema/context/json","ceterms:ctid":"ce-2ed68e68-0c9a-47cd-9496-058ec6186ec6","ceterms:name":{"en-US":"Concrete Slab Moisture Testing Technician"},"ceterms:ownedBy":["https://credentialengineregistry.org/resources/ce-d635640c-319e-45e5-968b-a7c0a70c56f0"],"ceterms:offeredBy":["https://credentialengineregistry.org/resources/ce-d635640c-319e-45e5-968b-a7c0a70c56f0"],"ceterms:identifier":[{"@type":"ceterms:IdentifierValue","ceterms:identifierTypeName":{"en-US":"Source"},"ceterms:identifierValueCode":"Industry and Occupation codes derived from CareerOneStop's Certification Finder"}],"ceterms:inLanguage":["en"],"ceterms:description":{"en-US":"The CSMT Certification course is for those seeking to become an ICRI Certified Concrete Slab Moisture Testing Technician-Grade 1. Participants attend the 3-4 hour education session and written examination component. Applicants are also required to perform each of the five (5) applicable ASTM tests included in the program under the watchful eye of a qualified judge who will not provide any level of coaching.\n\nWith the successful completion and passing of the written and performance examinations, an ICRI Concrete Slab Moisture Testing Technician-Grade 1 certification will be issued by ICRI and the individual will receive a certificate and wallet card. The individual also has the option of being added to the ICRI Certified CSMT online database.\n\nICRI Certified Concrete Slab Moisture Testing Technician-Grade 1 is valid for five (5) years from the date of completion and passing of all applicable certification requirements."},"ceterms:industryType":[{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.census.gov/naics/","ceterms:targetNode":"https://www.census.gov/naics/?input=2361\u0026year=2022\u0026details=2361","ceterms:codedNotation":"2361","ceterms:frameworkName":{"en-US":"NAICS"},"ceterms:targetNodeName":{"en-US":"Residential Building Construction"},"ceterms:targetNodeDescription":{"en-US":"Residential Building Construction"}},{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.census.gov/naics/","ceterms:targetNode":"https://www.census.gov/naics/?input=2362\u0026year=2022\u0026details=2362","ceterms:codedNotation":"2362","ceterms:frameworkName":{"en-US":"NAICS"},"ceterms:targetNodeName":{"en-US":"Nonresidential Building Construction"},"ceterms:targetNodeDescription":{"en-US":"Nonresidential Building Construction"}},{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.census.gov/naics/","ceterms:targetNode":"https://www.census.gov/naics/?input=2371\u0026year=2022\u0026details=2371","ceterms:codedNotation":"2371","ceterms:frameworkName":{"en-US":"NAICS"},"ceterms:targetNodeName":{"en-US":"Utility System Construction"},"ceterms:targetNodeDescription":{"en-US":"Utility System Construction"}},{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.census.gov/naics/","ceterms:targetNode":"https://www.census.gov/naics/?input=2373\u0026year=2022\u0026details=2373","ceterms:codedNotation":"2373","ceterms:frameworkName":{"en-US":"NAICS"},"ceterms:targetNodeName":{"en-US":"Highway, Street, and Bridge Construction"},"ceterms:targetNodeDescription":{"en-US":"Highway, Street, and Bridge Construction"}},{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.census.gov/naics/","ceterms:targetNode":"https://www.census.gov/naics/?input=2379\u0026year=2022\u0026details=2379","ceterms:codedNotation":"2379","ceterms:frameworkName":{"en-US":"NAICS"},"ceterms:targetNodeName":{"en-US":"Other Heavy and Civil Engineering Construction"},"ceterms:targetNodeDescription":{"en-US":"Other Heavy and Civil Engineering Construction"}},{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.census.gov/naics/","ceterms:targetNode":"https://www.census.gov/naics/?input=2381\u0026year=2022\u0026details=2381","ceterms:codedNotation":"2381","ceterms:frameworkName":{"en-US":"NAICS"},"ceterms:targetNodeName":{"en-US":"Foundation, Structure, and Building Exterior Contractors"},"ceterms:targetNodeDescription":{"en-US":"Foundation, Structure, and Building Exterior Contractors"}},{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.census.gov/naics/","ceterms:targetNode":"https://www.census.gov/naics/?input=2389\u0026year=2022\u0026details=2389","ceterms:codedNotation":"2389","ceterms:frameworkName":{"en-US":"NAICS"},"ceterms:targetNodeName":{"en-US":"Other Specialty Trade Contractors"},"ceterms:targetNodeDescription":{"en-US":"Other Specialty Trade Contractors"}}],"ceterms:occupationType":[{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.onetcenter.org/taxonomy.html","ceterms:targetNode":"https://www.onetonline.org/link/summary/47-2051.00","ceterms:codedNotation":"47-2051.00","ceterms:frameworkName":{"en-US":"Standard Occupational Classification"},"ceterms:targetNodeName":{"en-US":"Cement Masons and Concrete Finishers"},"ceterms:targetNodeDescription":{"en-US":"Smooth and finish surfaces of poured concrete, such as floors, walks, sidewalks, roads, or curbs using a variety of hand and power tools. Align forms for sidewalks, curbs, or gutters; patch voids; and use saws to cut expansion joints."}},{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://www.onetcenter.org/taxonomy.html","ceterms:targetNode":"https://www.onetonline.org/link/summary/47-2061.00","ceterms:codedNotation":"47-2061.00","ceterms:frameworkName":{"en-US":"Standard Occupational Classification"},"ceterms:targetNodeName":{"en-US":"Construction Laborers"},"ceterms:targetNodeDescription":{"en-US":"Perform tasks involving physical labor at construction sites. May operate hand and power tools of all types: air hammers, earth tampers, cement mixers, small mechanical hoists, surveying and measuring equipment, and a variety of other equipment and instruments. May clean and prepare sites, dig trenches, set braces to support the sides of excavations, erect scaffolding, and clean up rubble, debris, and other waste materials. May assist other craft workers."}}],"ceterms:subjectWebpage":"https://www.icri.org/our-certifications/csmt-program/","ceterms:credentialStatusType":{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://credreg.net/ctdl/terms/CredentialStatus","ceterms:targetNode":"credentialStat:Active","ceterms:frameworkName":{"en-US":"Credential Status"},"ceterms:targetNodeName":{"en-US":"Active"},"ceterms:targetNodeDescription":{"en-US":"Awards of the credential are ongoing."}}}