{"@id":"https://credentialengineregistry.org/resources/ce-d68f6963-6c57-473f-8d31-bcefea872fc6","@type":"ceterms:CertificateOfCompletion","@context":"https://credreg.net/ctdl/schema/context/json","ceterms:ctid":"ce-d68f6963-6c57-473f-8d31-bcefea872fc6","ceterms:name":{"en-US":"Empower Lineworker Pre-Apprenticeship Program"},"ceterms:ownedBy":["https://credentialengineregistry.org/resources/ce-a8667c2b-e019-4996-9d46-2a1c8877aef9"],"ceterms:inLanguage":["en"],"ceterms:description":{"en-US":"Pre-Apprenticeship Program, students gain the skills needed to become apprentice lineworkers. These are the utility workers who install, maintain and repair the power lines that move electricity. They may inspect and test power lines and equipment, and identify defective devices, voltage regulators, transformers and switches. In this program, students take classes in safety, fitness, basic electricity, and energy industry fundamentals."},"ceterms:estimatedCost":[{"@type":"ceterms:CostProfile","ceterms:name":{"en-US":"Empower Lineworker Pre-Apprenticeship Program"},"ceterms:price":6231.0,"ceterms:currency":"USD","ceterms:costDetails":"https://www.jccmi.edu/program/lineworker-pre-apprentice/","ceterms:description":{"en-US":"The program's total cost of tuition and required fees, assuming normal time to completion. Examples: Athletic center fees, technology fees, and lab fees."},"ceterms:directCostType":{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://credreg.net/ctdl/terms/CostType","ceterms:targetNode":"costType:AggregateCost","ceterms:frameworkName":{"en-US":"Cost Type"},"ceterms:targetNodeName":{"en-US":"Aggregate Cost"},"ceterms:targetNodeDescription":{"en-US":"Sum of direct costs."}}}],"ceterms:occupationType":[{"@type":"ceterms:CredentialAlignmentObject","ceterms:codedNotation":"49-9051.00","ceterms:targetNodeName":{"en-US":"Electrical Power-Line Installers and Repairers"},"ceterms:targetNodeDescription":{"en-US":"Install or repair cables or wires used in electrical power or distribution systems. May erect poles and light or heavy duty transmission towers."}}],"ceterms:subjectWebpage":"https://www.jccmi.edu/program/lineworker-pre-apprentice/","ceterms:audienceLevelType":[{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://credreg.net/ctdl/terms/AudienceLevel","ceterms:targetNode":"audLevel:PostSecondaryLevel","ceterms:frameworkName":{"en-US":"Audience Level"},"ceterms:targetNodeName":{"en-US":"Post-Secondary Level"},"ceterms:targetNodeDescription":{"en-US":"Intended for those who have completed secondary level school programs or equivalent."}}],"ceterms:estimatedDuration":[{"@type":"ceterms:DurationProfile","HasValue":true,"ceterms:exactDuration":"P48W"}],"ceterms:credentialStatusType":{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://credreg.net/ctdl/terms/CredentialStatus","ceterms:targetNode":"credentialStat:Active","ceterms:frameworkName":{"en-US":"Credential Status"},"ceterms:targetNodeName":{"en-US":"Active"},"ceterms:targetNodeDescription":{"en-US":"Awards of the credential are ongoing."}},"ceterms:instructionalProgramType":[{"@type":"ceterms:CredentialAlignmentObject","ceterms:framework":"https://nces.ed.gov/ipeds/cipcode/Default.aspx?y=56","ceterms:targetNode":"https://nces.ed.gov/ipeds/cipcode/cipdetail.aspx?y=56\u0026cip=46.0303","ceterms:codedNotation":"46.0303","ceterms:frameworkName":{"en-US":"Classification of Instructional Programs"},"ceterms:targetNodeName":{"en-US":"Lineworker."},"ceterms:targetNodeDescription":{"en-US":"A program that prepares individuals to apply technical knowledge and skills to install, operate, maintain and repair local, long-distance, and rural electric power cables and communication lines; erect and construct pole and tower lines; and install underground lines and cables.  Includes instruction in cable installation and repair, fibre-optic technology, trenching, mobile equipment and crane operation, high-voltage installations, maintenance and inspection, safety, remote communications, and applicable codes and standards."}}]}